Business Rules

      A proposal number must be entered and also must exist in the Proposal table.

      A status code must be entered/selected.

      An agency must be entered/selected.

      Entry of a project title is required. The user should enter the title as listed on sponsor forms.

      Start and stop dates are required. The stop date cannot be earlier than the start date (it can be the same, though).

      The direct cost amount is required. $0 is acceptable.

      The indirect cost amount is required. $0 is acceptable.

      An entry date is required.

      A grant description code is required. There are seven options in the current table.

      An account number is required.

      Entry of at least one project director is required on both the Accounts tab and on the Project Director tab.

      A chart/org is required.

More:

Institutional Value Examples