• A proposal number must be entered and also must exist in the Proposal table.
• A status code must be entered/selected.
• An agency must be entered/selected.
• Entry of a project title is required. The user should enter the title as listed on sponsor forms.
• Start and stop dates are required. The stop date cannot be earlier than the start date (it can be the same, though).
• The direct cost amount is required. $0 is acceptable.
• The indirect cost amount is required. $0 is acceptable.
• An entry date is required.
• A grant description code is required. There are seven options in the current table.
• An account number is required.
• Entry of at least one project director is required on both the Accounts tab and on the Project Director tab.
• A chart/org is required.
More: