Business Rules

•      A proposal number must be entered and also must exist in the Proposal table.

•      A status code must be entered/selected.

•      An agency must be entered/selected.

•      Entry of a project title is required. The user should enter the title as listed on sponsor forms.

•      Start and stop dates are required. The stop date cannot be earlier than the start date (it can be the same, though).

•      The direct cost amount is required. $0 is acceptable.

•      The indirect cost amount is required. $0 is acceptable.

•      An entry date is required.

•      A grant description code is required. There are seven options in the current table.

•      An account number is required.

•      Entry of at least one project director is required on both the Accounts tab and on the Project Director tab.

•      A chart/org is required.

More:

Institutional Value Examples